Site Photos Over Time
Following are pictures of the site starting in 2006 when the Draft Terms of Reference for the Landfill Expansion Plan were published for public review. Residents and neighbours were all surpised by this announcement and the state of the site was totally unacceptable.
This annoucment and the odour that started being tracked eventually lead to the formation of the CLCLC. Even though the site has improved and odour have diminished, residents need to remain vigilant about the state and the plans for the site.
2006
View from Terry Fox Road, Spring 2006

Trash Blown Around Carp Road Exit, March 2006

Exposed Waste, North Side, Sep 2006

2007
Biosolids Spreading, Full View, Sep 2007

Biosolids Spreading, Close-Up, Sep 2007

2008
CLCLC Site Visit, Sep 2008

LandFill Gaz to Energy (LFGE) Facility Under Construction, Sep 2008

Lagoon, Poplar Forest and LFGE Facility viewed from the Top, Sep 2008

Candlestick Flare Start-Up, Oct 08

2009
Candlestick and 2 Permanent Flares, Jan 2009

Electric Lines Under Construction, Jan 2009

Bringing Electricity to gaz pump wells, Feb 09


West end Beanie Cap Installation August 2009
1) Key and horizontal collector

2) Crushed clear stone and filter cloth as part of the collection system.

3) Top of liner and clay anchor

4) Clay on top of beanie cap

November 2009
Full View

Remaining fill area

More Photos 2009:
The document attached contains more photos of the site that show some of the work completed by WM and also to update some of the activities that are ongoing at the site. More WM Photos 2009.
|